[abnormal movement] the end of the external mine encountered another emergency. Iron ore opened up by 5%.

Published: May 18, 2020 10:13

SMM5 March 18: black is generally high this morning, iron ore straight up more than 5% to 690 yuan / ton, thread up nearly 2%, hot coil up nearly 3%.

Iron ore opened high today mainly because VALE's mine license in Brumadinho was revoked by the local government. Local health authorities said that the city of Blumadino in (Minas Gerais), Minas Gilles, Brazil, had suspended Vale's operating license and that the company's on-site activities "did not comply with the rules of social segregation." The city has issued a decree that only activities related to helping residents affected by the dam rupture can be carried out because of fears that workers may be exposed to covid-19. The city did not disclose how long it will affect Vale's operations.

On the other hand, low domestic iron ore port inventories also support ore prices. As of May 15, inventories at 35 ports tracked by SMM totaled 101.79 million tons, down 1.18 million tons from the previous month and 21.89 million tons from a year earlier. Jingtang port month-on-month rise, the previous steel mills have been in the stage of digesting inventory, most steel mill inventory is low, because some steel enterprises worry that there may be transport restrictions during the two sessions next week, the port sparse port month-on-month increase, short-term port inventory is still difficult to see a substantial accumulation.

However, it is worth noting that the two sessions will be held this week, Beijing-Tianjin-Hebei region may implement more stringent environmental production restrictions, iron ore prices have the risk of rising and falling.

SMM "combination of period and present" training course

Registration contact: Lu Qingping, Iron and Steel Division of SMM

Tel: 021mur51595781 / 187MUE 1777MUE 4590

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Apr 23, 2026 19:27
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Read More
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Market Dynamics] It was reported that the website of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone recently published the "Public Notice of the Management Committee of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone on the Acceptance of the Environmental Impact Assessment Report for the Waste Lead-Acid Battery Collection (5,000 mt/year) Project of Fenghuan (Yingkou) Environmental Technology Co., Ltd." Upon completion, the project will have a waste lead-acid battery turnover capacity of 5,000 mt/a and a maximum storage capacity of 100 mt.
Apr 23, 2026 19:27
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Apr 17, 2026 18:05
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Read More
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
[Secondary Lead Market Update] It was reported that recently, the Hefei Branch of Bank of Jiujiang, in response to the characteristics of the secondary lead industry — "capital-intensive raw material procurement and urgent production turnover needs" — assembled a professional team and customized a comprehensive financial service plan, ultimately approving a credit line of 280 million yuan for Anhui Lukong Environmental Protection Co., Ltd.
Apr 17, 2026 18:05